An optional technique used to control a well with a gas kick in which gas migration can be safety controlled by using the drillpipe pressure as a bottom-hole pressure indicator.
For abnormal-high flow rates, the blind ram BOP´s should be closed. The well must be controlled with the Volumetric Method until snubbing or coiled tubing equipment arrives at the rig.